AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Live nasa launch today9/10/2023 ![]() ![]() The propulsion module is equipped with a payload called Spectro-polimetry of HAbitable Planet Earth (SHAPE). The propulsion module, after separation, will remain in orbit around the Moon, and act as a communications relay satellite. After reaching this orbit, the lander module and the propulsion module will separate. The propulsion module will carry the lander module to the final 100-kilometre circular orbit. ![]() The Chandrayaan-3 lander has been designed in such a way that it can land softly on the Moon at a specified site, and deploy the rover, whose aim is to conduct in-situ chemical analysis of the lunar surface. These are the Chandra's Surface Thermophysical Experiment (ChasTE), Instrument for Lunar Seismic Activity (ILSA), Langmuir Probe, Laser Retroreflector Array (LRA) Rover, and Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA). The objectives of Chandrayaan-3, apart from demonstrating a safe and soft landing and roving capabilities on the lunar surface, is to conduct in-situ scientific experiments, and develop and demonstrate new technologies required for interplanetary missions.Ĭhandrayaan-3's lander will be equipped with five payloads. Chandrayaan-3: Objectives, Payloads, And Planned TrajectoryĬhandrayaan-3 aims to put a lander and a rover on the Moon’s highlands near the south pole, and to demonstrate end-to-end landing and roving capabilities. The spacecraft has a mission life of one lunar day, which is equivalent to 14 Earth days. The launch vehicle used this time is called LVM3-M4. Unlike its predecessor, Chandrayaan-3 will not carry an orbiter. The Launch Vehicle Mark III (LVM3), the Indian Space Research Organisation's (ISRO's) most powerful rocket, launched Chandrayaan-3 from Satish Dhawan Space Centre, Sriharikota, Andhra Pradesh. Chandrayaan-3, the succeeding mission to Chandrayaan-2, was launched on Friday, July 14, 2023, at 2:35 pm IST. The rover is rectangle-shaped, and has six wheels and a navigation camera.Ĭhandrayaan-3 Launch HIGHLIGHTS: Welcome to the live blog for the launch countdown of Chandrayaan-3. The lander is also equipped with an X-band antenna which will ensure communications. The lander is box-shaped, and has four landing legs, four landing thrusters, a number of sensors to ensure a safe touchdown, and a suite of cameras to avoid hazards and have positional knowledge. The main thruster nozzle is located at the bottom of the propulsion module. It will serve as the mounting structure for the lander. The cylinder is called the Intermodule Adapter Cone. The propulsion module will carry the lander module to the final 100-kilometre circular orbit after reaching which the lander module and the propulsion module will separate.Īfter the separation, the propulsion module will remain in orbit around the Moon, and act as a communications relay satellite.Īccording to NASA, the propulsion module, a box-like structure, will be mounted with a large solar panel on one side and a large cylinder on top. The aim of the payloads on the rover is to conduct in-situ chemical analysis of the lunar surface. NASA's new moon mission could put humans on the moon as early as 2025 for the first time in over half a century, ITV News' Martha Fairlie reports.Chandrayaan-3 Launch Countdown Live Updates: Chandrayaan-3's lander has been designed in such a way that it can land on the Moon at a specified site, and deploy the rover. It will take the Orion capsule, powered by the Airbus-built European Service Module (ESM), into the Moon’s orbit. The Artemis 1 mission will see the first launch of the new 322ft tall Space Launch System (SLS) rocket, which the agency says is the world’s most powerful rocket to date. However, there will be astronauts on board for subsequent missions, with the first crewed flight into space scheduled for 2024. ![]() The moon rocket's flight is the first in the space agency’s Artemis programme and will launch without a human crew for this mission. NASA said the first opportunity for the next Artemis 1 launch attempt will be Friday, 2 September, just before 1pm BST (8am EST), depending on how the engine issue develops. However the launch was called off by the launch director moments before it was due to get underway, after engineers found an 'engine bleed'. The Space Launch System rocket was set to lift off un-crewed on Monday, with three test dummies aboard its first flight. The space agency has assured the countdown will begin again next week, as it prepares for a launch set to mark the next chapter in putting humans back on the moon. NASA's Artemis 1 moon rocket launch has been postponed to a new date, after engine problems scuppered the initial take-off. By delaying the launch due to engine problems - NASA is playing it safe, ITV News correspondent Robert Moore reports. ![]()
0 Comments
Read More
Leave a Reply. |